Member: Level Electrical Ashburton
Project: Wongan Hills Dairy Shed installation
At Kaituna Valley in Banks Peninsula, the Wongan Hills Dairy Shed represents a significant investment in high-efficiency dairy production.
With fixed deadlines driven by calving, the project required speed, coordination and adaptability from day one.
Level Electrical Ashburton delivered the complete electrical solution for the 60-bale rotary facility, supporting daily operations, productivity and future growth.
A large-scale rural installation
This project involved delivering electrical infrastructure for a complex, high-output dairy facility designed to support 680 cows initially, increasing to 800 in the coming seasons.
The scale of the operation required careful planning and coordination to ensure all systems worked seamlessly together, from power distribution through to production monitoring.

Scope of work
Level Electrical Ashburton delivered a complete electrical solution across the site, including:
- Full electrical installation for a 60-bale rotary dairy shed
- Effluent system controls and installation
- Grain milling and feed distribution systems
- Power distribution to the barn and solar system
- Wireless data bridge and site-wide connectivity
- Production monitoring camera system
- Generator supply and installation
- Heat pumps for amenity areas
- Irrigation pump systems
Working through challenging site conditions
The project was impacted by seasonal weather, with high rainfall and clay-based ground conditions creating difficult site access and drainage challenges.
Despite this, the team maintained steady progress through strong coordination, regular site communication and proactive planning, ensuring alignment across all contractors and keeping the project on track.
Delivering under pressure
With fixed deadlines driven by calving, timing was critical to ensure the shed was operational when required. The team worked at pace, adapting to changes on site while maintaining clear communication across all stakeholders.
"Brent, Phil and the team at Level delivered an outstanding result on our dairy conversion project. With tight timeframes driven by calving, flexibility and speed were critical. The team went above and beyond to keep things moving, communicated clearly throughout, and adapted to changes as they came up. I’d have no hesitation recommending Level to any prospective clients."
-Brent Thomas, Wongan Hills Dairy Shed

Delivering capability for the future
The project was completed to a high standard, with the quality of work recognised by both the client and other contractors on site.
Beyond the build itself, the project strengthened the team’s capability in delivering large-scale dairy infrastructure, opening the door to further opportunities across the rural sector.
Project details
- Client: Brent Thomas, Wongan Hills Dairy Shed
- Location: Banks Peninsula, Canterbury, New Zealand
Level Project Team
- Phil Moore, Rural & Dairy Project Manager
- Brent Christie, Managing Director
- Craig Hydes, Dairy Technician and Advanced Fitter Welder
- Flynn McKenzie, Qualified Electrician
- RJ Passion, Apprentice Electrician