What we do

  • Full bathroom and ensuite plumbing, from rough-in to fit-off
  • Walk-in and level-entry showers
  • Toilets, including wall-hung and back-to-wall pans
  • Vanities, basins and tapware
  • Baths, freestanding and built-in
  • Kitchen and laundry plumbing, including gas hobs
  • Replacing old pipework while the walls are open

Apartment bathroom refits

In the CBD, Te Aro and Oriental Bay, most bathrooms are in apartments. The bathroom is small, there's no window, and every pipe connects to something shared.

Some buildings want to see plans before a bathroom is touched, and many set the hours trades can work. If the job needs a shared-riser shutdown, we liaise with the body corporate or building manager and let neighbours know when the water is going off.

Moving a toilet or shower in an apartment isn't always possible. Waste pipes need enough fall to reach the stack, and concrete floors limit where they can go. We check this at the start so your designer isn't drawing something that can't be built.

Waterproofing matters more in an apartment than anywhere else. A failed shower floor leaks into the unit below. Our leak detection work regularly turns up the result. We set the shower waste in the right spot and at the right height, so the floor can be formed to fall to it before the waterproofer and tiler go in.

House and townhouse renovations

Bathrooms in Thorndon, Mt Victoria and Newtown villas often hide galvanised pipe, old copper with patched joints and drains that have been added to for a hundred years. When the floor and walls come out, that's the time to replace them.

We look at the whole system while it's open. That covers supply pipes, wastes and the drain the bathroom connects to. Newer houses and townhouses are simpler to work in, but the same rule applies: lock in your fixtures before the walls close. If your hot water is old or low pressure, it's worth sorting at the same time. See hot water cylinders for mains pressure upgrades.

Have these on site for rough-in

Plumbing gets built into the walls and floor at rough-in. Some fittings have parts that sit inside the wall, so choosing them isn't enough. They need to be on site when we rough in:

  • Shower mixer. Most shower mixers have a body that goes inside the wall. We need it on site at rough-in.
  • Wall-mounted basin and kitchen mixers. Many have an in-wall body too, so they need to be on site at rough-in.
  • In-wall cisterns and wall-hung toilet frames. The frame and cistern are built into the wall at rough-in. A back-to-wall pan needs its waste and supply in a set position, so pick the model early.
  • Shower tray. The tray sets where the waste goes and how high it sits, so it needs to be on site at rough-in. A tiled level-entry shower with a linear drain needs the floor built with the right fall. That's planned at framing, not at tiling.
  • Vanity. The vanity's height and style set where the pipes come out of the wall.
  • Hot water. A large rain shower head can use more hot water than an old cylinder can supply. Check before you buy.

Order these early. Send us your fixture list and we'll confirm every item works together before the builder closes the walls.

Working with your builder

Plumbing has three main visits on a renovation. First we disconnect and make safe the existing plumbing and gas, so demolition can be done safely. Rough-in happens once the framing is up and before the linings go on. Fit-off happens once tiling and painting are done. Getting those timings right keeps the job moving.

We talk to your builder before the job starts, agree the order of works and turn up when we say we will. If you don't have a builder, we can recommend one we trust and liaise with them for you.

Consents

Swapping fixtures like for like, or moving them around within the same room, usually doesn't need a building consent. Relocating a toilet, shower or basin to a different room, or adding extra fixtures, does. It's worth checking with your local council too. We tell you which applies before you commit, and we provide the plumbing details and certificates the council needs to sign off.

Kitchens and laundries

Kitchen renovations usually mean moving the sink, adding a dishwasher, fitting a waste disposal unit or running a water line to the fridge. We check the waste has enough fall to reach the drain before the cabinetry is ordered. Wall-mounted kitchen mixers need to be on site at rough-in, the same as in a bathroom.

In the laundry, we move tubs and washing machine taps, and plumb laundries into cupboards in apartments and townhouses.

If you're adding a gas hob or moving the gas line, our gasfitters handle that alongside the plumbing. See gasfitting.

Pricing

We quote renovations from your plans, or from a site visit if the plans aren't finished yet.

Where we work

We plumb bathrooms and renovations across the CBD, Te Aro, Thorndon, Pipitea, Wadestown, Mt Victoria, Kelburn, Oriental Bay, Aro Valley, Newtown, Karori and Hataitai, and for homeowners across the wider Wellington region, from Porirua to the Hutt Valley and Kāpiti.

Call 04 886 3354 or use the quote form below.